Blog

Office staff moved in to third floor
Posted by on



Last week furniture was delivered and assembled on the third floor of the building. NERCC staff moved from the previously leased space in South Boston in to the third floor over this past weekend. Additionally, staff from Piledrivers Local 56, Shop and Millmen Local 51, and Woodframe Local 723 have also moved their offices to the third floor.


Third room conference room.
Notice the view through the transparent LED sign.

Furniture assembly and move-in for office staff of the Boston Carpenters Apprenticeship and Training Fund on the second floor will begin next week.


Second floor pavilion/lobby area.

browse POSTS BY CATeGORY: